SA

2019 

2020 

2021 

2022 

2023 

actual

actual

actual

forecast

forecast

 

TOTAL

50,364

73,232

61,698

361,598

396,273

1

Investment projects, incl.:

14,985

40,718

25,206

312,280

350,919

1.1

Rehabilitation of Power unit#1 with installation of new ESP

4,953

1,890

10,930

26,110

105,528

1.2

Expansion and reconstruction of Ekibastuz SDPP-2 with installation of power unit No. 3

0

8,322

104

6,684

47,197

1.3

Transition to cyclical-and-continuous method of mining, transportation, blending and loading of coal at the "Bogatyr" open-pit coal mine of Ekibastuz coal deposit

553

25,504

9,693

11,445

0

1.4

Construction of SS “Kokozek”

0

20

2,000

758

0

1.5

Construction of  SS “Turksib”

0

0

19

0

522

1.6

 Reconstruction of Almaty city cable grids

0

0

0

6,000

9,160

1.7

Expansion of Almaty CHP-1 with the construction of 200-250 MW CCGT unit

0

0

0

45,014

43, 668

1.8

"Modernization of Almaty CHP-2 including reduction of environmental footprint"

0

0

314

124,832

63,400

1.9

Reconstruction of  Almaty CHP-3 based on CCGT unit with an increase in the plant’s capacity up to 450 MW"

0

0

0

81,025

78,602

1.10

Construction of a 60 MW wind power plant in Shelek corridor including a possible increase in capacity to 300 MW (25%)

3,917

11

23

3,189

0

1.11

Construction of 50MW Ereymentau WPP

200

913

2,099

6,398

25

1.12

Construction of a gas turbine power plant based on Pridorozhnoe gas field

91

52

13

0

0

1.13

Other projects

5,270

4,006

11

825

2,816

2

Maintenance of production assets

34,596

31,787

35,198

46,818

44,994

2.1

“Bogatyr Komir” LLP (50%)

7,658

5,547

4,243

8,288

9,133

2.2

“Station Ekibastuz SDPP-2” JSC (50%)

798

1,050

1,616

2,068

3,232

2.3

“Ekibastuz SDPP-1” LLP

7,711

6,187

8,886

14,844

14,153

2.4

“Alatau Zharyk Company” JSC

11,124

12,646

10,692

9,791

12,187